Profilstahl

Elevator Guide Rail

    Material: Q235

     

    Standard: ISO7465:2007

     

    Certificate: ISO, CQC, CE, SGS

Shanghai Metal Corporation is a leading Elevator Guide Rail for Lead Frames manufacturer and supplier.

Guide rails are part of the inner workings of most elevator and lift shafts, functioning as the vertical, internal track. The guide rails are fixed to two sides of the shaft; one guides the elevator car and the other for the counterweight. In tandem, these rails operate both as stabilization within the shaft during routine use and as a safety system in case of emergency stops. Elevator guide rails are important parts of elevator safety and operation quality. When the elevator appears to be overspeed, they should undertake the auxiliary brake mechanism to stop the elevator.

Generally, T Type Elevator Guide Rail and Hollow Elevator Guide Rail are commonly used. Besides, there are some elevator parts available, for example, fish plate, guide clip, guide shoe, inverter, etc. Guide rails are manufactured by cold bending method with a basic length of 5m. The solid connection parts are produced by mechanical processing.

If you want to know more about our steel products or Elevator Guide Rail for Lead Frames price please feel free to contact us, we will reply you within 24 hours.

Technical information of Elevator Guide Rail:



Packaging of Elevator Guide Rail:


More of  Elevator Guide Rail:


Q1: Can I add my logo on the elevator parts?

A: Yes, OEM and ODM are available for us. But you should send us the Trademark authorization letter and there is min quantity limited

 

Q2: How can I get the after-service?

A: We will send you the spare parts by free if the problems are caused by us.

 

Q3 : Do you have inspection procedures for elevator parts?

A: 100% self-inspection by QC before packing.

 

Q4: Can I pay by western union or any other payment term?

A:Sure, we accept many kinds of payment term. For the details, you can send email to discuss with us.

 

Q5: What is the delivery time of the parts?

A: Generally, there is much stock of standard parts. For the non-standard, the delivery time is about 4-5 weeks.

 

Quality Control:


Production Line:


KLICKEN SIE HIER FÜR PREIS
KLICKEN SIE
HIER
FÜR
PREIS

We will contact with you within 8 hours

* E-mail:Double check your email address, maybe you have spelling mistakes, thanks.
Land:
* Detail: